DEQ has been operating the Clean Diesel (DERA) program since FY 2008 and Volkswagen Settlement programs since 2018. Below you will find recipient details for all Volkswagen Settlement programs and Clean Diesel programs.
Check out our new interactive map dashboards! VW and DERA 2017-Present DERA 2008-2012
Volkswagen Settlement Recipients
FY 2022 Alternative Fuel School Bus (AFSB) Program FY 2020 AFSB FY 2019 AFSB FY 2018 AFSBChargeOK FY2021ChargeOK 2019 FY 2021 On-Road Program
FY22 projects are in progress. Award amounts and descriptions may change upon completion. AFSB Program page
Entity
|
Award Amount
|
Project Description
|
Bethany Public Schools (PS) |
$275,019.75 |
Replacement of three diesel school buses (vehicle years 2005, 2007, 2007) with three EPA-certified 2022 or newer Propane/LPG school buses |
Cave Springs PS |
$101,116.50 |
Replacement of one diesel school bus (vehicle year 2009) with one EPA-certified 2022 or newer Propane/LPG school buses |
Woodall PS |
$91,466 |
Replacement of one diesel school bus (vehicle year 2000) with one EPA-certified 2022 or newer Propane/LPG school buses |
Entity
|
Award Amount
|
Project Description
|
Cameron Public Schools (PS) |
$139,344 |
Replacement of three diesel school buses (vehicle years 2000, 2001, 2009) with three EPA-certified 2020 or newer Propane/LPG school buses |
Keystone PS |
$138,472.50 |
Replacement of three diesel school buses (vehicle years 1991, 2004, 2004) with three EPA-certified 2020 or newer Propane/LPG school buses |
Nashoba PS |
$92,988 |
Replacement of two diesel school buses (vehicle years 2006, 2003) with two EPA-certified 2020 or newer Propane/LPG school buses |
Entity
|
Award Amount
|
Project Description
|
Anadarko Public Schools (PS) |
$304,557.50 |
Replacement of two diesel school buses (vehicle years 1996, 1999) with two EPA-certified 2019 or newer Propane/LPG school buses |
Battiest PS |
$225,877 |
Replacement of five diesel school buses (vehicle years 2001, 2004, 2004, 2005, and 2008) with five EPA-certified 2019 or newer Propane/LPG school buses |
Bethany PS |
$93,790.90 |
Replacement of two diesel school buses (vehicle years 2000 and 2004) with two EPA-certified 2019 or newer Propane/LPG school buses |
Chattanooga PS |
$181,288 |
Replacement of four diesel school buses (vehicle years 2003, 2003, 2007, and 2007) with four EPA-certified 2019 or newer Propane/LPG school buses |
Cordell PS |
$125,257.23 |
Replacement of three diesel school buses (vehicle years 2000, 2004, and 2004) with three EPA-certified 2019 or newer Propane/LPG school buses |
Davenport PS |
$44,054 |
Replacement of one 1999 diesel school bus with one EPA-certified 2019 or newer Propane/LPG school bus |
Empire PS |
$125,257.23 |
Replacement of three diesel school buses (vehicle years 1998, 1999, and 2000) with three EPA-certified 2019 or newer Propane/LPG school buses |
Gans PS |
$125,624 |
Replacement of three diesel school buses (vehicle years 2007, 2008, and 2008) with three EPA-certified 2019 or newer Propane/LPG school buses |
Keys PS |
$91,834 |
Replacement of two 2002 diesel school buses with two EPA-certified 2019 or newer Propane/LPG school buses |
Ponca City PS |
$115,505 |
Replacement of three diesel school buses (vehicle years 2003, 2007, and 2007) with three EPA-certified 2019 or newer Propane/LPG school buses |
Wellston PS |
$83,628 |
Replacement of two diesel school buses (vehicle years 1999 and 2004) with two EPA-certified 2019 or newer Propane/LPG school buses |
Entity
|
Award Amount
|
Project Description
|
Anadarko Public Schools (PS) |
$226,955 |
Replacement of two 1999 diesel school buses, one 2007 diesel school bus, one 2008 diesel school bus, and one 2009 diesel school bus with five EPA-certified 2017 or newer Propane/LPG school buses |
Bethany PS |
$90,000 |
Replacement of one 1994 diesel school bus and one 1998 diesel school bus with two EPA-certified 2017 or newer Propane/LPG school buses |
Keys PS |
$90,836 |
Replacement of one 2004 diesel school bus and one 2007 diesel school bus with two EPA-certified 2017 or newer Propane/LPG school buses |
Mangum PS |
$88,966 |
Replacement of one 1996 diesel school bus and one 2006 diesel school bus with two EPA-certified 2017 or newer Propane/LPG school buses |
McCord PS |
$36,655 |
Replacement of one 2006 diesel school bus with one EPA-certified 2017 or newer Propane/LPG school bus |
Perkins-Tryon PS |
$128,092 |
Replacement of two 2004 diesel school buses and one 2005 diesel school bus with three EPA-certified 2017 or newer Propane/LPG school buses |
Ponca City PS |
$41,978 |
Replacement of one 2003 diesel school bus and two 2007 diesel school buses with three EPA-certified 2017 or newer Propane/LPG school buses |
Stroud PS |
$45,418 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer Propane/LPG school bus |
Weatherford PS |
$215,760 |
Replacement of three 2005 diesel school buses and one 2008 diesel school bus with four EPA-certified 2017 or newer CNG school buses |
Wellston PS |
$161,544 |
Replacement of three 1999 diesel school buses and one 1995 diesel school bus with four EPA-certified 2017 or newer Propane/LPG school buses |
The ChargeOK program has issued notifications to proceed for all projects awarded in FY2021. Specific charging station locations will be available once the recipients submit information to the US Department of Energy’s Alternative Fuel Data Center (click for interactive map). Users may also find the nearest charging station at plugshare.com.
Entity
|
Award Amount
|
Project Location
|
Number of Chargers
|
Level 2
|
Level 3
|
City of Comanche |
|
|
|
|
|
$70,512 |
Comanche |
|
2 |
City of Perry |
|
|
|
|
|
$53,407.20 |
Perry |
|
1 |
Francis Energy |
|
|
|
|
|
$253,693.60 |
Hobart |
|
2 |
ASAP Energy |
|
|
|
|
|
$98,544.80 |
Duncan |
|
2 |
|
$121,556.80 |
Weatherford |
|
2 |
Excel Food Mart |
|
|
|
|
|
$166,112.11 |
Okemah |
|
2 |
The ChargeOK program has issued notifications to proceed for all projects awarded in 2019. Specific charging station locations will be available once the recipients submit information to the US Department of Energy’s Alternative Fuel Data Center (click for interactive map). Users may also find the nearest charging station at plugshare.com.
Entity
|
Award Amount
|
Project Location
|
Number of Chargers
|
Level 2
|
Level 3
|
City of Pawhuska |
|
|
|
|
|
$17,115.20 |
Pawhuska |
1 |
|
Catoosa Hospitality Management Inc. |
|
|
|
|
|
$8,080 |
Catoosa |
1 |
|
Owasso Hospitality Management Inc. |
|
|
|
|
|
$8,080 |
Owasso |
1 |
|
City of Edmond |
|
|
|
|
|
$25,367 |
Edmond |
10 |
|
Oklahoma City Community College |
|
|
|
|
|
$127,753 |
Oklahoma City Community College |
8 |
|
OnCue |
|
|
|
|
|
$101,495.19 |
Edmond |
|
1 |
|
$96,770.34 |
Midwest City |
|
1 |
|
$94,555.74 |
Oklahoma City S. Meridian |
|
1 |
|
$96,639 |
Oklahoma City NW 36th |
|
1 |
Francis Solar |
|
|
|
|
|
$56,848 |
Antlers |
|
2 |
|
$105,937 |
Blackwell |
|
4 |
|
$114,961 |
Chandler – Turner Turnpike |
|
4 |
|
$66,580 |
Chickasha – H. E. Bailey Turnpike |
|
2 |
|
$46,708.10 |
Durant |
|
4 |
|
$61,286 |
Enid |
|
2 |
|
$43,129 |
Guymon |
|
2 |
|
$49,862.57 |
Henryetta |
|
2 |
|
$109,283 |
Lawton |
|
4 |
|
$115,091 |
McAlester – Indian Nations Turnpike |
|
4 |
|
$108,342 |
Muskogee |
|
4 |
|
$66,580 |
Muskogee – Muskogee Turnpike |
|
2 |
|
$44,014 |
Norman |
|
2 |
|
$66,431 |
Seiling |
|
2 |
|
$54,278 |
Stillwater |
|
2 |
|
$108,312 |
Tulsa S. Memorial |
|
4 |
|
$39,523 |
Tulsa S. Darlington |
|
2 |
|
$100,698 |
Wagoner |
|
4 |
FY21 projects are in progress. Award amounts and descriptions may change upon completion. On-Road Program page
Entity
|
Award Amount
|
Project Description
|
A & A Trucking, Inc |
$258,453.68 |
4 Heavy Duty CNG Dump Trucks |
Atlas-Tuck Concrete, Inc |
$443,600.96 |
8 Heavy Duty Diesel Concrete Mixer Trucks |
Canadian County District 1 |
$110,744.58 |
1 Heavy Duty Diesel Dump Truck |
Central Oklahoma Transportation and Parking Authority |
$666,661.00 |
1 Heavy Duty CNG Transit Bus and 2 Medium Duty CNG Shuttle Buses |
City of Elk City |
$213,039.75 |
1 Heavy Duty CNG Trash Truck |
City of Lawton |
$638,532.00 |
3 Heavy Duty Diesel Dump Trucks and 2 Heavy Duty Diesel Waste Haulers |
City of Moore |
$162,153.00 |
1 Medium Duty CNG Grapple Truck |
City of Midwest City |
$200,000.00 |
1 Heavy Duty CNG Refuse Truck |
City of Norman |
$450,000.00 |
1 Heavy Duty Electric Transit Bus |
Oklahoma City Environmental Assistance Trust |
$302,000.00 |
2 Heavy Duty CNG Refuse Trucks |
City of Stroud |
$66,198.00 |
1 Medium Duty Diesel Dump Truck |
Sysco Oklahoma, LLC |
$66,198.00 |
14 Heavy Duty Diesel Freight Trucks |
City of Tulsa |
$189,504.42 |
14 Heavy Duty Diesel Freight Trucks |
Clean Diesel (DERA) Recipients
FY 2021FY 2020FY 2019FY 2018FY 2017FY 2012FY 2011FY 2010FY 2009FY 2008ARRA/Stimulus Program
FY21 projects are in progress. Award amounts and descriptions may change upon completion. DERA Program Page
Entity
|
Award Amount
|
Project Description
|
Bennington PS |
$21,250.00 |
Replacement of one 2009 diesel school bus with one EPA-certified 2019 or newer diesel school bus |
Blanchard PS |
$51,760.50 |
Replacement of two 2005 diesel school buses with two EPA-certified 2019 diesel school buses |
Central High PS |
$22,673.00 |
Replacement of one 2008 diesel school bus with one EPA-certified 2019 gasoline school bus |
Colbert PS |
$16,250.00 |
Replacement of one 2004 diesel school bus with one EPA-certified 2019 diesel school bus |
Commerce PS |
$101,997.00 |
Replacement of one 2003, one 2004, one 2005, and one 2008 diesel school buses with four EPA-certified gasoline school buses |
Howe PS |
$77,811.00 |
Replacement of three 2008 diesel school buses with three EPA-certified 2019 or newer diesel school buses |
Lexington PS |
$75,000.00 |
Replacement of two 1997 and one 1998 diesel school buses with three EPA-certified diesel school buses |
Mustang PS |
$92,961.00 |
Replacement of three 2008 diesel school buses with three EPA-certified 2019 or newer gasoline school buses |
Pawnee PS |
$20,000.00 |
Replacement of one 2009 diesel school bus with one EPA-certified 2019 or newer gasoline school bus |
Stigler PS |
$21,662.00 |
Replacement of one 2009 diesel school bus with one EPA-certified 2019 or newer diesel school bus |
Stillwater PS |
$66,881.25 |
Replacement of two 2007, and one 2009 diesel school buses with three EPA-certified 2019 or newer diesel school buses |
Temple PS |
$25,708.00 |
Replacement of one 2008 diesel school bus with one EPA-certified 2019 or newer gasoline school bus |
Yukon PS |
$21,250.00 |
Replacement of one 2004 diesel school bus with one EPA-certified 2019 or newer gasoline school bus |
FY20 projects are in progress. Award amounts and descriptions may change upon completion. DERA Program Page
Entity
|
Award Amount
|
Project Description
|
Allen PS |
$26,742.25 |
Replacement of one 2007 diesel school bus with one EPA-certified 2018 or newer school bus |
Cave Springs PS |
$19,882.25 |
Replacement of one 2004 diesel school bus with one EPA-certified 2018 or newer school bus |
Central High PS |
$18,954.00 |
Replacement of one 2007 diesel school bus with one EPA-certified 2018 or newer school bus |
Claremore PS |
$21,955.25 |
Replacement of one 1999 diesel school bus with one EPA-certified 2018 or newer school bus |
Enid PS |
$38,375.00 |
Replacement of one 1999 diesel school bus with one EPA-certified 2018 or newer school bus |
Fairland PS |
$19,000.00 |
Replacement of one 2004 diesel school bus with one EPA-certified 2018 or newer school bus |
Kingfisher PS |
$40,000.00 |
Replacement of one 2002 and one 2004 diesel school buses with two EPA-certified 2018 or newer school buses |
Mannford PS |
$21,000.00 |
Replacement of one 1996 diesel school bus with one EPA-certified 2018 or newer school bus |
Miami PS |
$41,104.00 |
Replacement of one 1998 and one 2002 diesel school buses with two EPA-certified 2018 or newer school buses |
Mustang PS |
$71,124.75 |
Replacement of two 2002 and one 2004 diesel school buses with three EPA-certified 2018 or newer school buses |
Shady Grove PS |
$19,700.00 |
Replacement of one 2005 diesel school bus with one EPA-certified 2018 or newer school bus |
Talihina PS |
$19,675.00 |
Replacement of one 2002 and one 2003 diesel school buses with two EPA-certified 2018 or newer school buses |
Taloga PS |
$21,230.00 |
Replacement of one 1999 diesel school bus with one EPA-certified 2018 or newer school bus |
Yukon PS |
$84,893.00 |
Replacement of one 2000, two 2004, and one 2005 diesel school buses with four EPA-certified 2018 or newer school buses |
Zaneis PS |
$20,495.00 |
Replacement of one 2006 diesel school bus with one EPA-certified 2018 or newer school bus |
Entity
|
Award Amount
|
Project Description
|
Bishop PS |
$20,920.50 |
Replacement of one 2002 diesel school bus with one EPA-certified 2018 or newer school bus |
Boswell PS |
$43,823 |
Replacement of one 1997 and one 2000 diesel school buses with two EPA-certified 2018 or newer school buses |
Davenport PS |
$39,924.75 |
Replacement of one 1998 diesel school bus with one EPA-certified 2018 or newer school bus |
Edmond PS |
$239,607.50 |
Replacement of two 2002, one 2003, five 2008, and two 2009 diesel school buses with ten EPA-certified 2018 or newer school buses |
Enid PS |
$37,253.75 |
Replacement of one 1996 diesel school bus with one EPA-certified 2018 or newer school bus |
Fort Towson PS |
$59,750 |
Replacement of one 2004, one 2005, and one 2009 diesel school buses with three EPA-certified 2018 or newer school buses |
Lexington PS |
$18,890 |
Replacement of one 1998 diesel school bus with one EPA-certified 2018 or newer school bus |
Middleberg PS |
$43,804 |
Replacement of two 2005 diesel school buses with two EPA-certified 2018 or newer school buses |
Mounds PS |
$19,989 |
Replacement of one 2008 diesel school bus with one EPA-certified 2018 or newer school bus |
Mustang PS |
$62,907.75 |
Replacement of one 1999, one 2001, and one 2002 diesel school buses with three EPA-certified 2018 or newer school buses |
Noble PS |
$42,500 |
Replacement of one 2008 and one 2009 diesel school buses with two EPA-certified 2018 or newer school buses |
Silo PS |
$24,985.91 |
Replacement of one 1999 diesel school bus with one EPA-certified 2018 or newer school bus |
Washington PS |
$39,963.50 |
Replacement of two 2002 diesel school buses with two EPA-certified 2018 or newer school buses |
Entity
|
Award Amount
|
Project Description
|
Calera PS |
$35,440.50 |
Replacement of one 1999 diesel school bus and one 2002 diesel school bus with two EPA-certified 2017 or newer school buses |
Caney Valley PS |
$19,725 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer school bus |
Edmond PS |
$234,827 |
Replacement of four 2001 diesel school buses, two 2002 diesel school buses, and four 2003 diesel school buses with ten EPA-certified 2017 or newer school buses |
Lawton PS |
$97,500 |
Replacement of two 1998 diesel school buses, two 1999 diesel school buses, and one 2000 diesel school bus with five EPA-certified 2017 or newer school buses |
Piedmont PS |
$22,866.75 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer school bus |
Spiro PS |
$65,869 |
Replacement of three 2000 diesel school buses with three EPA-certified 2017 or newer school buses |
Stigler PS |
$18,567 |
Replacement of one 1996 diesel school bus with one EPA-certified 2017 or newer school bus |
Vian PS |
$19,185 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer school bus |
Yukon PS |
$177,931.25 |
Replacement of one 2002 diesel school bus, two 2003 diesel school buses, two 2004 diesel school buses, and four 2005 diesel school buses with nine EPA-certified 2017 or newer school buses |
Entity
|
Award Amount
|
Project Description
|
Boswell PS |
$18,208.75 |
Replacement of one 1995 diesel school bus with one EPA-certified 2017 or newer school bus |
Broken Arrow PS |
$88,000 |
Replacement of five 1996 diesel school buses with five EPA-certified 2017 or newer school buses |
Carnegie PS |
$40,961 |
Replacement of one 2004 diesel school/activity bus and one 2006 diesel school/activity bus with two EPA-certified 2017 or newer school/activity buses |
Catoosa PS |
$20,497.25 |
Replacement of one 1999 diesel school bus with one EPA-certified 2017 or newer school bus |
Comanche PS |
$26,517.75 |
Replacement of one 1996 diesel activity bus with one EPA-certified 2017 or newer activity bus |
Dolese Bros |
$47,195 |
Replacement of one 1995-2006 heavy-duty diesel truck with one EPA-certified 2017 or newer heavy-duty truck |
Howe PS |
$63,019.50 |
Replacement of one 2003 diesel school bus and two 2004 diesel school buses with three EPA-certified 2017 or newer school buses |
Noble PS |
$21,000 |
Replacement of one 2002 diesel school bus with one EPA-certified 2017 or newer school bus |
Oaks PS |
$19,380.50 |
Replacement of one 2002 diesel school bus with one EPA-certified 2017 or newer school bus |
Piedmont PS |
$22,866.75 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer school bus |
Pretty Water PS |
$20,000 |
Replacement of one 2000 diesel school bus with one EPA-certified 2017 or newer school bus |
Sallisaw PS |
$52,339.90 |
Replacement of one 2000 diesel school bus, one 2002 diesel school bus, and one 2004 diesel school bus with three EPA-certified 2017 or newer school buses; Installation of two fuel operated heaters (auxiliary heaters) on one 2000 diesel school bus and one 2006 diesel school bus |
Snyder PS |
$19,461.25 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer school bus |
Springer PS |
$19,461 |
Replacement of one 2002 diesel school/activity bus with one EPA-certified 2017 or newer school/activity bus |
Stigler PS |
$18,874.25 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer school bus |
Entity
|
Award Amount
|
Project Description
|
Latta PS |
$38,800 |
Replacement of a 1997 model year diesel school bus with a new 2013 diesel school bus that meets the latest emission control standards. |
Pocola PS |
$38,000 |
Replacement of a 1990 model year diesel school bus with a new 2011 diesel school bus that meets the latest emission control standards. |
Jenks PS |
$47,130 |
Replacement of a 1990 model year diesel school bus with a new 2011 diesel school bus that meets the latest emission control standards. |
Sallisaw PS |
$105,000 |
Retrofit 10 diesel school buses, model years 2004-2009, with auxiliary heaters. Replacement of 3 model year 1990-1992 diesel school buses with 3 new 2013 diesel school buses that meet the latest emission control standards. |
Yukon PS |
$66,548 |
Retrofit 38 diesel school buses, model years 1999-2006 with auxiliary heaters. |
Entity
|
Award Amount
|
Project Description
|
Guthrie PS |
$64,264 |
Retrofit 21 diesel school buses, model years 2002-2005 with auxiliary heaters |
Hominy PS |
$34,000 |
Replacement of a 1994 model year diesel school bus with a new 2013 diesel school bus that meets the latest emission control standards |
Noble PS |
$76,848.41 |
Retrofit 26 diesel school buses, model years 2001-2011, with auxiliary heaters |
Entity
|
Award Amount
|
Project Description
|
Beggs PS |
$38,844.89 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Canton PS |
$76,954 |
Replacement of 2 model year 1999 or older diesel school buses with a new 2010 emissions standard diesel school buses. |
Chisholm Trail Technology Center |
$34,365 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Minco PS |
$30,000 |
Replacement of 4 model year 1999 or older diesel school buses with a new 2010 emissions standard diesel school buses. |
Sallisaw PS |
$37,455 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Entity
|
Award Amount
|
Project Description
|
Lawton PS |
$227,496 |
Replacement of 6 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Entity
|
Award Amount
|
Project Description
|
Beggs PS |
$40,000 |
Replacement of 1 model year 1999 or older diesel school buses with a new 2010 emissions standard diesel school bus. |
Chisholm Trail Technology Center |
$37,475 |
Replacement of 1 model year 1999 or older diesel school buses with a new 2010 emissions standard diesel school bus. |
Friend PS |
$7,918 |
Retrofit 3 school bus engines with Diesel Oxidation Catalysts and Closed Crankcase Ventilation Systems. |
Kingfisher PS |
$59,382 |
Replacement of 2 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Lomega PS |
$65,000 |
Replacement of 2 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Poteau PS |
$61,063 |
Retrofit 15 school bus engines with Closed Crankcase Ventilation Systems and Diesel Multistage Filters. |
Sallisaw PS |
$39,890 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Tulsa PS |
$74,000.05 |
Retrofit 5 school bus engines with Diesel Particulate Filters / Closed Crankcase Ventilation System combinations and 35 school bus engines with Closed Crankcase Ventilation Systems. |
Entity
|
Award Amount
|
Project Description
|
Edmond PS |
$235,000 |
Replacement of 11-12 model year 1997 or older diesel school buses with new 2007 or later emissions standard diesel school buses. |
El Reno PS |
$56,250 |
Replacement of 4 model year 1997 or older diesel school buses with new 2007 or later emissions standard diesel school buses. |
Guthrie PS |
$49,792 |
Retrofit 30 model year 1998-2006 diesel school bus engines with emission reduction equipment such as Diesel Oxidation Catalysts, Closed Crankcase Ventilation Systems and/or Diesel Particulate Filters. |
Jenks PS |
$150,000 |
Replacement of 6 model year 1997 or older diesel school buses with new 2007 or later emissions standard diesel school buses. |
Meridian Technology Center |
$25,000 |
Replacement of 1 model year 1997 or older diesel school bus with a new 2007 or later emissions standard diesel school bus. |
Metro Technology Centers |
$91,500 |
Replacement of 2 model year 1997 or older diesel school buses with new 2007 or later emissions standard diesel school buses. They also will retrofit 6 model year 1998-2006 diesel school bus engines with emission reduction equipment such as Diesel Oxidation Catalysts, Closed Crankcase Ventilation Systems and/or Diesel Particulate Filters. |
Putnam City PS |
$250,000 |
Replacement of 16 model year 1997 or older diesel school buses with new 2007 or later emissions standard diesel school buses. |
Sand Springs PS |
$37,019 |
Replacement of 1 model year 1997 or older diesel school bus with a new 2007 or later emissions standard diesel school bus. |
Yukon PS |
$250,000 |
Retrofit 44 model year 1998-2006 diesel school bus engines with emission reduction equipment such as Diesel Oxidation Catalysts, Closed Crankcase Ventilation Systems and/or Diesel Particulate Filters. |
Alex PS |
$22,000 |
Retrofit 4 model year 1998-2006 diesel school bus engines with emission reduction equipment such as Diesel Oxidation Catalysts, Closed Crankcase Ventilation Systems and/or Diesel Particulate Filters. |
Allen-Bowden PS |
$150,000 |
Replacement of 3 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Caney Valley PS |
$75,000 |
Replacement of 2 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Dale PS |
$42,500 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Jennings PS |
$85,000 |
Replacement of 2 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Lexington PS |
$90,000 |
Replacement of 2 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Liberty PS |
$190,000 |
Replacement of 4 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Milfay PS |
$38,750 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Mount Saint Mary High School |
$36,500 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Noble PS |
$159,056 |
Replacement of 4 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
North Rock Creek PS |
$40,000 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. |
Okmulgee PS |
$156,969 |
Replacement of 4 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Pretty Water PS |
$51,000 |
Replacement of 1 model year 1999 or older diesel school bus with a new 2010 emissions standard diesel school bus. Retrofit 1 model year 1998-2006 diesel school bus engine with emission reduction equipment such as a Diesel Oxidation Catalyst, Closed Crankcase Ventilation System and/or Diesel Particulate Filter. |
Shawnee PS |
$200,000 |
Replacement of 4 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Tuttle PS |
$90,000 |
Replacement of 2 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |